new system for bead fixing

Status
Not open for further replies.
I have received an email today from China informing me that the cost of my tape has gone up 400%.
This is due to a shortage of raw material. I am in the process of getting samples made in UK but have been given a lead time of 6 weeks, now i know why.
Your fuckingg bat s**t tappy, u still banging on about that tape, u weirdo
 
new system for bead fixing
 
ok my germ spreading spreads today I will be testing the tape as a scrim on a ceiling, pictures to follow
throughout the day.
 
Taped up cracks, needs a little scrape then going to pva.
 

Attachments

  • new system for bead fixing
    20200320_094708.jpg
    1.2 MB · Views: 302
above 30,000 views so have been asked to put this up save scrolling.
 
Last edited:
Status
Not open for further replies.
Back
Top